The 2009 Winter Programme is extensive to say the least! Check out the work that will be carried out over the Winter period to ensure the course is at its best when the warmer weather arrives.
- Vertidrain all greens & tees and topdress.
- Vertidrain fairways.
- Rebuild left hand side of 1st Medal tee.
- Improve drainage through the ditch on the 5th.
- Drainage work to right of 3rd green, left side of 5th green, right side of 16th green, 2nd, 15th, 16th, 8th and back of 13th.
- Improve paths on 5th, 6th and 7th.
- Trim trees and driving areas.
- Returf all current GUR areas.
- Refurbish rails along 10th tee.
- Improve Trolley Park by 2nd tee.
- Turn unsused bowling green into Chipping area.